McCarthy Architecture News

1 minute reading time (57 words)

SMU Fondren Lab E-46 Renovation Progress

At Southern Methodist University, construction is underway for a new lab facility at an existing building near campus.  The renovation work is centered around two large lab spaces, with an adjacent conference room, storage room, and restroom.  In addition, a new ramp and stairs have been provided at the exterior to create code-compliant access into the space.

Deanan Exterior CROPPED REDONE D

Deanan Interior D

SMU Fondren 012320 3 D

SMU Fondren 012320 4 D

SMU Fondren 012320 5 D

SMU Fondren 012320 6 D

Royal Oaks Maintenance Facility Progress
Royal Oaks Maintenance Facility Progress

By accepting you will be accessing a service provided by a third-party external to https://www.mccarthyarchitecture.com/